It’s finally time to put the road in. The crew is planning the installation of all the utilities that run along the central road; they will be vital to the operation of The Falling Waters community.
The excavator starts digging the trenches and laying out the conduit.
The FURmen are back to inspect the electrical conduit and transformer installation.
Now that the roadway is cleared and the utilities installed, we can start laying compacted gravel, and get started on the sidewalk at the same time.