Asphalt and Pavement
The road is getting finished! The asphalt has officially been laid and the final sidewalks are getting poured.
The Center Haus Imagined by Ann Raab, The Community Center was designed to act as the hearth of the whole neighborhood. On the first story, the Community Center features a live-in rooms and a wide open, sun drenched lobby. Connected to the lobby is the conservatory, where community events and family gatherings will be hosted….
It’s finally time to put the road in. () here and his crew are planning the installation of all the utilities that follow along the central road, these will be vital to the operation of the Falling Waters community. The excavator starts digging the trenches and laying out the conduit. The FURmen are back to…
Ann Raab has lovingly raised three exceptional puppies, Dune, Nugget, and Arctic, to serve as devoted caretakers at Falling Waters Continuing Care Community. After months of training and preparation, all three have officially passed their certification exams, earning their place as on-site therapy dogs for our residents. These canine companions will play an important role…
The Falling Waters road and pavement are officially completed, and ready for a scenic drive or walk through the beautiful grounds. The winding road has plenty of side-street parking as depicted in the drone shot below. You can also see the beginning of landscaping next to the sidewalk. Please come by and take a walking…
First things first is to clear the area for the roadway. We made sure to section of any trees so no greenery was harmed in the process. Next up is bringing in the equipment for utilities. Our favorite furry supervisors made sure the delivery ran smoothly. Check back soon for more updates!
Comments are closed.
https://shorturl.fm/xCOSv